Faktor-Faktor yang Mempengaruhi Tingkat Akurasi Perkiraan Biaya pada Tahap Konstruksi Gedung di Pemerintahan Kota Sungai Penuh

Boyke Heri Wahyudi, Martalius Peli, Zaitul Zaitul

Abstract


Inaccurate cost estimates in building construction projects are often a source of budget overruns that disrupt project efficiency, including in the Sungai Penuh City Government. Several projects, such as the construction of a community health center, PSC building, and health laboratory, show significant deviations between the planned budget and actual costs. This study aims to identify the main factors influencing the accuracy of cost estimates, determine the dominant factors at play, and analyze the combined impact of these factors on the overall quality of cost estimation. The method used is a quantitative approach through the distribution of questionnaires to parties involved in the project, including the Project Implementation Unit (PPK), contractors, consultants, and technical teams. Data analysis was conducted using Confirmatory Factor Analysis (CFA) and multiple linear regression with the assistance of SPSS 22. The results of the study revealed three significant main groups of factors, namely estimator competence, information availability, and cost estimation calculation quality. Among the three, estimator competence was the most dominant factor. The research instrument was found to be valid and reliable with KMO values > 0.5 and Cronbach’s Alpha > 0.6. The conclusions of this study emphasize the importance of enhancing estimator capacity through continuous training, providing accurate cost databases, and standardizing estimation procedures. These efforts are expected to promote budget efficiency and improve the overall success of government construction projects.


Keywords


Cost Estimation, Estimate Accuracy, Construction Management, CFA, Linear Regression.

Full Text:

PDF

References


Adianto, Y. L. D., Wimala, M., & Harun, A. M. (2022). Faktor-Faktor Pengaruh Besaran Estimasi Biaya Tidak Langsung Pada Penawaran Pekerjaan Jalan Oleh Kontraktor X. Jurnal Rekayasa Sipil, 18(1), 52-59.

Asmadi, D., & Rahmawati, S. (2021). Analisis dan Estimasi Biaya. Syiah Kuala University Press.

Christian, Y., Harimurti, & Wijatmiko, I. (2017). Pemodelan Peningkatan Akurasi Estimasi Biaya dengan Metode Structural Equation Modeling-Partial Least Square Pada Proyek Jalan Provinsi Kalimantan Tengah. Rekayasa Sipil, 11(2), 91–101.

Ghozali, I. (2006). Aplikasi analisis multivariate dengan program SPSS. Badan Penerbit Universitas Diponegoro.

Howay, I., Bachmid, S., & Supardi, S. (2022). Analisis Faktor yang Berpengaruh terhadap Akurasi Biaya pada Tahap Desain Proyek Jalan Nasional: Studi Kasus Peningkatan Jalan Basuki Rahmat Kota Sorong. Jurnal Konstruksi: Teknik, Infrastruktur dan Sains, 1(7), 30-39.

Jumas, D. Y. (2020). Model Estimasi Biaya pada Bangunan Gedung. LPPM Universitas Bung Hatta. ISBN 978-623-93573-7-5.

Ramahwati, A., & Osly, P. J. (2024). ESTIMASI BIAYA DAN PENJADWALAN PEMBANGUNAN PROTOTIPE RUANG MODULAR OPERATING THEATRE. Jurnal ARTESIS, 4(2), 124-131.

Ramdani, R. N., Kartika, N., & Tahadjuddin, T. (2025). Aplikasi Perhitungan Biaya Dan Estimasi Waktu Untuk Bangunan Gedung. Jurnal Talenta Sipil, 8(1), 17-25.

Rinaldi, M., Prayudyanto, M. N., & Syaiful, S. (2021). Persepsi Masyarakat terhadap Tingkat Kepuasan Pelayanan Bus Transjabodetabek dengan Metode Uji Asumsi Klasik dan Uji Regresi Linear Berganda. In Seminar Nasional Ketekniksipilan, Infrastruktur dan Industri Jasa Konstruksi (KIIJK) (Vol. 1, No. 1, pp. 309-315).

Riza, A. D. (2009). Faktor Faktor Dalam Proses Estimasi Biaya Yang Mempengaruhi Kinerja Pelelangan Proyek EPC. ii–201.

Salim, M. A., & ST, M. (2018). Estimasi BiayaKonstruksi.

Soeharto, I. (2017). Manajemen Proyek Dari Konseptual Sampai Operasional. Erlangga.

Sumargo, B. (2020). Teknik sampling. Unj press.

Utama, B. K., & Raya, G. D. J. (2019). Kajian Waktu Dan Biaya Pekerjaan Rigid Pavement Pada Kabupaten Indragiri Hilir (Paket Preservasi Rekonstruksi Jalan Sei. Akar–Bagan Jaya–Kuala Enok–Rumbai Jaya–Tembilahan).

Wibowo, A., & Wuryanti, W. (2008). Model matematis penentuan interval profit yang wajar untuk pelaksanaan proyek konstruksi. Jurnal Teknik Sipil, 15(1), 15-26.




DOI: http://dx.doi.org/10.33087/talentasipil.v8i2.884

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.