Pengimplementasian Sistem Building Information Modelling Pada Tahapan Penjadwalan Gedung PUT PNJ

Budi Afriani, Irika Widiasanti, Intan Puspa Wangi

Abstract


In the process of achieving goals, projects have characteristics called triple constraints, including specific target time, cost, and performance requirements. The delay in the completion process in a project is what will disrupt the triple constraint which has an impact on waste. One of the reasons is that the project still uses conventional methods. This research was conducted to provide information related to conventionally designed scheduling and with the implementation of Building Infortmation Modeling (BIM), namely using several supporting software including, Naviswork, Microsoft Project and Revit at the scheduling stage of multi-storey buildings, namely at the PNJ PUT Laboratory Building. The results showed that the elaboration of scheduling planning using BIM is more efficient, easy to understand, and provides a visualization of the construction sequence and avoids waste. Then, some of the percentage of waste obtained if using conventional methods is, around 10% on materials, 40% of projects are over budget, 30% of projects are reworked, and almost 90% of projects are delayed. Thus, the implementation of BIM in project scheduling is very important to overcome things that can harm a project.


Keywords


Triple Constraint, Scheduling, Construction, Building Information Modelling

Full Text:

PDF

References


Andiyan. (2021). Penerapan BIM untuk Sistem Penjadwalan Proyek dengan Model 4D Estimasi Biaya Model 5D. Media Neliti.

Andy K. D. Wong, F. K. (2011). Government roles in implementing building information modelling systems. US.

BIBLIOGRAPHY Abrar, H. (2009). Manajemen Proyek. Yogyakarta.

Ervianto. (2005). Manajemen Proyek Konstruksi. Yogayakarta.

Indovace, M. (2021). BIM Levels and Dimensions explained- Scope and Benefits. INDOVACE.

Karina Latersiya, G. (2017). Investigasi Penerapan Konsep Building Information Modelling (BIM) pada Proyek Konstruksi High Rise Building di Indonesia.

Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Scientific Research.

Lenggogeni-Widiasanti. (2013). Manajemen Konstruksi. Bandung: Remaja Rosdakarya.

Ramadhan. (2020). Analisis Workflow Dalam BIM Execution Plan (BEP) Pada Proyek Knstruksi.

Sacks R.. Eastman, C. L. (2018). A Guideto Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers.

Yulyardi. (2018). BIM for the Accountable Infrastructure’s Construction SIBIMA Konstruksi .




DOI: http://dx.doi.org/10.33087/talentasipil.v7i1.435

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.