Evaluasi Penjadwalan Waktu Proyek Pembangunan Gedung Menggunakan Critical Path Method (CPM)

Annisaa Dwiretnani, Elvira Handayani, Niko Saputra

Abstract


Buildings are the physical form of the results of construction work that are integrated with their place of domicile, partly or wholly located on and/or in the land and/or water which functions as a place for humans to carry out their activities, both for housing (residence), religious activities, business activities, social activities, culture, and special activities (Article 1 Number 1 Law Number 28 of 2002 Concerning Building Buildings). The success or failure of a construction project is influenced by three aspects, namely costs that do not exceed the budget, quality according to specifications and time according to the implementation schedule. The existence of project time scheduling is needed to complete the project in a timely manner using several methods. This study aims to create a network for building construction projects using the Critical Path Method (CPM) and identify any work activities from building construction projects that are on a critical path. Research data only consists of secondary data in the form of project time schedules and documentation photos. Based on the analysis, it is known that there are 11 types of work that are on the critical path network of the Abdul Manap Hospital Inpatient Building Development Project in Jambi City using CPM analysis, which consists of AA (Preparatory Work) – BA (Work on Structure 1st Floor) – BB (Work on Structure 2nd Floor) – BC (Work on Structure on 3rd Floor) – BD (Work on Structure on 4th Floor) – BE (Work on Structure on Floor 1) – DF (Installation of Dirty Water, Used Water & Vent) – DA (Work on Structures on 4th Floor) Air Conditioning work) – DO (Lightning Protection Work) – FF (Chopstick Work) – FG (Parking and Greening Work). The total duration/time of completion of all work on the critical path is 240 days.

Keywords


Building project, Time scheduling, Critical Path Method

Full Text:

PDF

References


Asiyanto. 2009. Manajemen Risiko untuk Konraktor. Pradya Paramita: Jakarta.

Barrie, Donald S. dan Jr., Boy C. Paulson. 1990. Manajemen Konstruksi Profesional. Erlangga: Jakarta.

Djojowirono, Sugeng. 1991. Manajemen Konstruksi 1. Fakultas Teknik Universitas Gajah Mada: Yogyakarta.

Ervianto, I.W. 2006. Manajemen Proyek Konstruksi Edisi Revisi. Yogyakarta.

Heizer, J dan Render. 2006. Operation Management. Edisi Terjemahan. Salemba Empat: Jakarta.

Kerzner, H. 1982. Project Managment for Executives. Reinhold Company: Van Norstand.

Levin, Richard I. & Kirkpatrick Charles A. 1972. Perentjanaan dan Pengawasan dengan PERT dan CPM. Bhratara: Jakarta.

Rani, A, Hafnidar. 2016. Manajemen Proyek Konstruksi. Deepublish: Yogyakarta.

Republik Indonesia. 2002. Undang-Undang No. 28 Tahun 2002 tentang Bangunan Gedung. Lembaran Negara RI Tahun 2002, Pasal 1, Angka 1. Sekretariat Negara: Jakarta.

Republik Indonesia. 2002. Undang-Undang No. 28 Tahun 2002 tentang Bangunan Gedung. Lembaran Negara RI Tahun 2002, Bab III, Pasal 5. Sekretariat Negara: Jakarta.

Siswanto. 2007. Operation Research Jilid II. Erlangga: Jakarta.

Soeharto, I. 1995. Manajemen Proyek dan Konseptual sampai operasional. Erlangga: Jakarta.

Soeharto, I. 1999. Manajemen Proyek dan Konseptual sampai operasional. Erlangga: Jakarta.




DOI: http://dx.doi.org/10.33087/talentasipil.v6i2.334

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.