Analisis Ketidakpastian Durasi Menggunakan Metode PERT dan PDM Guna Mengantisipasi Risiko Pada Proyek Konstruksi

Divo Reynandra Hermanto, Lila Ayu Ratna Winanda, Deviany Kartika, Munasih Munasih

Abstract


Duration uncertainty is a major problem in construction projects because it has the potential to cause delays in implementation and increase the risk of rework. Time planning that uses only one duration estimate is often unable to represent the dynamic variations in field conditions, resulting in an unrealistic schedule. Therefore, a scheduling approach is needed that can accommodate duration uncertainty while systematically describing the relationships between activities. This study aims to analyze the duration uncertainty of work and identify critical activities in order to anticipate the risk of construction project delays. The research method used is the integration of the Program Evaluation and Review Technique (PERT) and the Precedence Diagram Method (PDM). Data was obtained through interviews, field observations, and technical project document studies to determine optimistic, most likely, and pessimistic duration estimates (a–m–b). These estimates were processed using the PERT method to calculate the expected time, standard deviation, and variance of activities, then arranged in a PDM work network to determine the critical path. The results showed that the expected project duration was 225 days, with the highest level of uncertainty found in the B3 floor 6 steel beam work, which had a variance value of 2.250. The accumulated standard deviation of the critical path is 13.88 days with a variance root value of approximately ±4 days, indicating the potential for project duration deviations from the planned schedule. Therefore, it is recommended that activities with high variance on the critical path receive more intensive time control and supervision to minimize the risk of project delays.

Keywords


Program Evaluation and Review Technique; Precedence Diagram Method; Project Scheduling; Risk; Schedule Variance.

Full Text:

PDF

References


Achmad, F.A. and Rumbyarso, Y.P.A. (2024) “Analisis Penjadwalan Proyek Klinik Spesialis Mata & THT Ayani dengan PERT & CPM,” Multiscience, (April), pp. 1–8.

Aldaffa, G., Munasih and Winanda, L.A.R. (2025) “Penerapan Metode Predence Diagram Method untuk Penjadwalan dan Pembiayaan Proyek Pembangunan Rumah Sakit,” e-journal, 2(1), pp. 1–10.

Anonim (2024) Analisis Harga Satuan Pekerjaan (AHSP) Bidang Cipta Karya dan Perumahan. Jakarta.

Bere, G. et al. (2024) “Analisis Penjadwalan Proyek Menggunakan Metode PERT ( Proyek Pembangunan Gedung DPRD Kabupaten Sleman Daerah Istimewa Yogyakarta ),” Jurnal Ilmiah Teknik dan Ilmu Komputer, 3(1), pp. 63–71.

Dwiretnani, A., Handayani, E. and Saputra, N. (2023) “Evaluasi Penjadwalan Waktu Proyek Pembangunan Gedung Menggunakan Critical Path Method (CPM),” Jurnal Talenta Sipil, 6(1995), pp. 391–400. Available at: https://doi.org/10.33087/talentasipil.v6i2.334.

Ekawati, R. et al. (2025) “Penerapan Metode CPM-PERT Berbasis MS Project dan Analisis Kausalitas pada Proyek Pembangunan Poliklinik ABC,” Journal of Systems Engineering and Management, 04(01), pp. 1–7.

Faisal, Ingsih, I.S. and Aasniari (2025) “Analisis Penjadwalan Proyek Konstruksi dengan Menggunakan Metode Project Evaluation Review Teknique (PERT) dan Critical Path Method (CPM) pada Proyek Pembangunan Gedung Riset dan Inovasi Ilmu Komputer Universitas Brawijaya Tahap 1,” Jurnal Rekayasa Sipil, 15(2), pp. 311–318.

Febriana, W. and Aziz, U.A. (2021) “Analisis Penjadwalan Proyek dengan Metode PERT Menggunakan Microsoft Project 2016,” Jurnal Ilmu Teknik Sipil, 5(d), pp. 37–45. Available at: http://jurnal.umpwr.ac.id/index.php/suryabeton%0AAnalisis.

Kojongian, J.F., Dundu, A.K.T. and Arsjad, T.T. (2025) “Penerapan Metode PERT Untuk Penjadwalan Gedung Kuliah FMIPA Jurusan Farmasi Universitas Sam Ratulangi Junita,” Jurnal Tekno, 23(91). Available at: https://ejournal.unsrat.ac.id/v3/index.php/tekno.

Langkun, C.N. V., Mangare, J.B. and Tjakra, J. (2025) “Penjadwalan Waktu Proyek Pembangunan Puskesmas Kakaskasen, Tomohon Dengan Menggunakan Metode PERT (Program Evaluation and Review Technique),” Jurnal Tekno, 23(91). Available at: https://ejournal.unsrat.ac.id/v3/index.php/tekno.

Lauriska, N.F., Negoro, Y.P. and Priyana, E.D. (2025) “Analisis Waktu dan Biaya Proyek Sistem Sie Water Menggunakan Metode CPM dan PERT (Studi Kasus: PT.Swadaya Graha),” Jurnal Teknologi dan Manajemen Industri Terapan (JTMIT), 4(4), pp. 1550–1558.

Mu’an, M.C., Hendriyani, I. and Devi, S.M. (2024) “Analisis Probabilitas Keberhasilan Proyek dengan Metode PDM dan PERT Pada Proyek Pembangunan,” Jurnal Penelitian Teknik, 1, pp. 104–115.

Pangestika Oirala Kawuri, S. (2025) “Evaluasi Penjadwalan Pembangunan Pembangkit Listrik Terapung dengan Menggunakan Metode Project Evaluation Review Technique (PERT),” Briliant: Jurnal Riset dan Konseptual Vol., 10(3), pp. 777–791. Available at: http://www.jurnal.unublitar.ac.id/ index.php/briliant.

Pratama, P.I., Winanda, L.A.R. and Munasih (2023) Penjadwalan Ulang dengan Precedence Diagram Method (PDM) pada Proyek Konstruksi Gedung Penunjang Pembelajaran Universitas Negeri Malang, Student Journal GELAGAR.

Sari, D.M. et al. (2025) “Biaya dan Waktu Proyek Gedung Satnarkoba dengan Metode CPM dan Metode PERT,” Jurnal Talenta Sipil, 8(2), pp. 900–906. Available at: https://doi.org/10.33087/talentasipil.v8i2.969.

Tamalika, T. et al. (2025) “Aplikasi Penjadwalan Proyek dengan PDM (Precedence Diagram Method) pada Pekerjaan Konstruksi di CV. Wahyu Jaya Persada Konsultan Palembang,” Jurnal Pengabdian Masyarakat, 3(1), pp. 66–76. Available at: http://jurnal.dokicti.org/index.php/bersama/index.

Wahyudiono, S. et al. (2023) “Penerapan Metode Program Evaluation and Review Technique (PERT) pada Proyek Malang Creative Center (MCC) Berdasarkan Building Information Modelling (BIM),” Media Teknik Sipil, 21(2), pp. 66–76. Available at: https://ejournal.umm.ac.id/index.php/jmts/article/view/28969.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1251

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.