Produktivitas Pekerjaan Struktur Pondasi Bore Pile pada Proyek Hotel X di Kota Lumajang

Tri Handoyo, Daimil Ihsan, Sucipto Sucipto

Abstract


Construction productivity plays a crucial role in determining the success and efficiency of project implementation. In foundation works, particularly bored pile installations, productivity is often affected by various technical and environmental factors. This study focuses on analyzing the productivity of bored pile foundation work on the Hotel X project in Lumajang City and identifying the dominant factors that hinder performance. The research employed a mixed-method approach combining quantitative productivity analysis with qualitative field observations and interviews. Productivity data were calculated using the Unit Completed method, while statistical testing was conducted using SPSS software to determine the correlation between influencing variables such as materials, equipment, labor, environment, and management. The analysis revealed that for bored piles with diameters of 600 mm and 500 mm at depths ranging from 5 to 18 meters, the average productivity rate was 0.86 meters per hour per unit during a 37-day observation period (totaling 1,713 working hours). Material factors contributed most significantly to productivity losses, accounting for 39.66% of total lost work hours (165.53 hours out of 417.35 hours), followed by environmental, equipment, labor, and management factors. The findings demonstrate that inadequate material logistics and unstable soil conditions substantially reduce project efficiency. In conclusion, effective management of these key factors is essential to improve productivity performance in bored pile foundation work on construction projects.

Keywords


Productivity, Bore Pile, Foundation

Full Text:

PDF

References


Alexsander, S., Sarie, F., Brita Gawei, A. P., & Dwinanda Sinaga, L. (2025). Analisis Penanganan Longsoran dengan Perkuatan Bored Pile (Studi Kasus: Ruas Jalan Tb. Lahung-Sp. Muara Laung Sta. 43+900). X(3).

Andriansyah, M. N. (2021). Analisis Perbandingan Pondasi Tiang Pancang Dengan Pondasi Tiang Bor Pada Proyek Pembangunan Puskesmas Paripurna Karangkembang Di Kecamatan Babat. DEARSIP : Journal of Architecture and Civil, 1(2), 43–52. https://doi.org/10.52166/dearsip.v1i2.2897

David, M., & Saputro, E. (2020). Analisis Produktivitas Alat Bor (Bore Machine) Pada Proses Pengeboran Pondasi Bored Pile di Kota Surabaya.

Difa Alghifari Fuad, M. (2023). Pelaksanaan Pekerjaan Pondasi Bored Pile Pada Titik P4 Fly Over Cisauk Kabupaten Tangerang. In Agustus.

Fadila, R. A., & Wulandari, A. P. (2023). Literature Review Analisis Data Kualitatif: Tahap Pengumpulan Data. Jurnal Penelitian, 1(3), 34–46.

Giggins, O. M., Cullen-Smith, S., Kenny, E., & Doyle, J. (2024). Integrating the quantitative with the qualitative: findings from a mixed methods cardiac rehabilitation exercise trial. Heart Rhythm O2, 5(7), 443–451. https://doi.org/10.1016/j.hroo.2024.06.003

Irfan Syahroni, M., STIT Al-Aziziyah, D., TGH Umar Abdul Aziz kapek Gunung Sari Lombok Barat, J. I., & pos, kode. (2022). Prosedur Penelitian Kuantitatif. Jurnal Al-Musthafa STIT Al-Aziziyah Lombok Barat, 43(3).

Jamil, N. A., & Siregar, C. A. (2023). Analisis Daya Dukung Fondasi Tiang Bor (Bored Pile) Berdasarkan Data Penetrasi Standar (SPT) dan Data Sondir (CPT). Sistem Infrastruktur Teknik Sipil (SIMTEKS), 3(2), 233. https://doi.org/10.32897/simteks.v3i2.1068

Kamila, R. A., & Maryam, P. A. S. M. (2022). Pelaksanaan Pekerjaan Pondasi Bored Pile Pada Proyek Gedung Utama Kejagung Jakarta. In Agustus.

Mahmudi, A. (2023). Analisis Hasil Pengujian Sondir Untuk Mengetahui Kapasitas Dukung Dan Penurunan Pondasi Tiang Pancang Dan Bore Pile Terhadap Variasi Dimensi Di Lokasi Ubhara Surabaya. INTER TECH, 1(1), 43–51. https://doi.org/10.54732/i.v1i1.1023

Muhammad Maulana, B., Roesyanto, R., & Iskandar, R. (2021). Analisis Pondasi Bored Pile pada Proyek Jalan Tol Medan-Kualanamu-Tebing dengan Metode Analitis dan Metode Elemen Hingga. Jurnal Syntax Admiration, 2(6), 978–993. https://doi.org/10.46799/jsa.v2i6.257

Mustika, R., Andriani, A., & Hakam, A. (2026). Prediksi Penurunan Pondasi Tiang Bor Menggunakan Metode Support Vector Machine. Jurnal Talenta Sipil, 9(1), 564–574. https://doi.org/10.33087/talentasipil.v9i1.1204

Ningsih, S. A. R., Setiawan, A. A., & Arbaningrum, R. (2023). Studi Perbandingan Pondasi Tiang Pancang Dan Tiang Bor Ditinjau Dari Biaya Dan Produktivitas Tenaga Kerja. Jurnal Muara Sains, Teknologi, Kedokteran Dan Ilmu Kesehatan, 7(2), 83–92. https://doi.org/10.24912/jmstkik.v7i2.23888

Safrudin, R., Zulfamanna, Kustati, M., & Sapriyanti, N. (2023). Penelitian Kualitatif. INNOVATIVE: Journal Of Social Science Research, 3(2), 9680–9694.

Simanjuntak, R., Roesyanto, R., & Harahapan, S. E. (2024). Analisis Daya Dukung Lateral Bored Pile Ø 80 Cm dengan Menggunakan Uji Beban Lateral dan Menggunakan Metode Elemen Hingga pada Proyek Menara BRI - Medan. Jurnal Syntax Admiration, 5(8), 3130–3137. https://doi.org/10.46799/jsa.v5i8.1398

Tampubolon, G., Roesyanto, R., & Hasibuan, G. C. R. (2024). Analisis Daya Dukung & Penurunan Bored Pile 80cm di Proyek Kompleks Kantor-Apartemen dengan Metode Analitis & Elemen Hingga. Jurnal Syntax Admiration, 5(4), 1249–1266. https://doi.org/10.46799/jsa.v5i4.1102

Taras Bulba, A., & Yunita, M. (2014). Studi Nilai Produktivitas Pekerjaan Pondasi Bored Pile. Jurnal Teknik SIpil, 3(2), 199–208.

Verison, K. A., & Mulya, E. S. (2023). Pelaksanaan Pondasi (Bored Pile) Pada Proyek Pembangunan Fly Over Cisauk. In Agustus.




DOI: http://dx.doi.org/10.33087/talentasipil.v9i1.1146

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Talenta Sipil, Faculty of Engineering, Batanghari University
Adress: Fakultas Teknik, Jl.Slamet Ryadi, Broni-Jambi, Kec.Telanaipura, Kodepos: 36122, email: talentasipil.unbari@gmail.com


Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.